Loading map…
Best track · IBTrACS
ArchivedPeak tropical storm
Tropical Storm Gritelle (1991)
Track & history
Peak wind
45 mph / 75 km/h
Min pressure
984 mb
Dates
–
Landfall
None
Storm history
Gritelle formed in the Southern Hemisphere in June 1991 and peaked as a tropical storm with maximum sustained winds of 45 mph (75 km/h) and a minimum pressure of 984 mb. It did not make landfall. The system was tracked for 12 days.
Track data
Download CSV| Time UTC | Position | Strength | Wind | Pressure |
|---|---|---|---|---|
| 1991-06-05 00:00 | 7.1°S 84.2°E | — | — | — |
| 1991-06-05 06:00 | 7.6°S 83.8°E | — | — | — |
| 1991-06-05 12:00 | 8.1°S 83.3°E | — | — | — |
| 1991-06-05 18:00 | 8.6°S 82.8°E | — | — | — |
| 1991-06-06 00:00 | 9.0°S 82.3°E | — | — | — |
| 1991-06-06 06:00 | 9.4°S 81.7°E | — | — | — |
| 1991-06-06 12:00 | 9.3°S 80.6°E | TD | 15 mph / 30 km/h | — |
| 1991-06-06 18:00 | 9.0°S 79.0°E | TD | 15 mph / 30 km/h | — |
Show all 47 points
| 1991-06-07 00:00 | 9.1°S 77.9°E | TD | 15 mph / 30 km/h | 1000 mb |
| 1991-06-07 06:00 | 9.2°S 76.9°E | TD | 25 mph / 35 km/h | 997 mb |
| 1991-06-07 12:00 | 9.4°S 76.0°E | TD | 25 mph / 35 km/h | 997 mb |
| 1991-06-07 18:00 | 9.7°S 75.1°E | TD | 30 mph / 45 km/h | 997 mb |
| 1991-06-08 00:00 | 10.0°S 74.4°E | TD | 30 mph / 45 km/h | 997 mb |
| 1991-06-08 06:00 | 10.1°S 73.4°E | TD | 35 mph / 55 km/h | 997 mb |
| 1991-06-08 12:00 | 10.0°S 72.4°E | TD | 35 mph / 55 km/h | 997 mb |
| 1991-06-08 18:00 | 10.0°S 71.9°E | TD | 35 mph / 55 km/h | 997 mb |
| 1991-06-09 00:00 | 10.1°S 71.4°E | TD | 35 mph / 55 km/h | 1000 mb |
| 1991-06-09 06:00 | 10.1°S 70.9°E | TS | 40 mph / 65 km/h | 997 mb |
| 1991-06-09 12:00 | 10.2°S 70.4°E | TS | 40 mph / 65 km/h | 997 mb |
| 1991-06-09 18:00 | 10.5°S 69.8°E | TS | 45 mph / 75 km/h | 997 mb |
| 1991-06-10 00:00 | 10.8°S 69.3°E | TS | 45 mph / 75 km/h | 991 mb |
| 1991-06-10 06:00 | 11.0°S 68.9°E | TS | 45 mph / 75 km/h | 987 mb |
| 1991-06-10 12:00 | 11.1°S 68.5°E | TS | 40 mph / 65 km/h | 984 mb |
| 1991-06-10 18:00 | 11.2°S 68.0°E | TS | 40 mph / 65 km/h | 984 mb |
| 1991-06-11 00:00 | 11.3°S 67.5°E | TS | 40 mph / 65 km/h | 984 mb |
| 1991-06-11 06:00 | 11.4°S 67.1°E | TS | 40 mph / 65 km/h | 988 mb |
| 1991-06-11 12:00 | 11.5°S 66.9°E | TS | 40 mph / 65 km/h | 993 mb |
| 1991-06-11 18:00 | 11.7°S 66.8°E | TS | 40 mph / 65 km/h | 993 mb |
| 1991-06-12 00:00 | 11.7°S 66.7°E | TD | 35 mph / 55 km/h | 991 mb |
| 1991-06-12 06:00 | 11.8°S 66.8°E | TD | 35 mph / 55 km/h | 991 mb |
| 1991-06-12 12:00 | 11.8°S 66.7°E | TD | 30 mph / 45 km/h | 995 mb |
| 1991-06-12 18:00 | 11.9°S 67.1°E | TD | 30 mph / 45 km/h | 997 mb |
| 1991-06-13 00:00 | 11.9°S 67.3°E | TD | 30 mph / 45 km/h | 997 mb |
| 1991-06-13 06:00 | 11.8°S 67.3°E | TD | 30 mph / 45 km/h | 997 mb |
| 1991-06-13 12:00 | 11.8°S 67.7°E | TD | 30 mph / 45 km/h | 997 mb |
| 1991-06-13 18:00 | 12.0°S 68.0°E | TD | 30 mph / 45 km/h | 1000 mb |
| 1991-06-14 00:00 | 12.1°S 67.9°E | TD | 30 mph / 45 km/h | 1000 mb |
| 1991-06-14 06:00 | 12.4°S 67.6°E | TD | 30 mph / 45 km/h | 1000 mb |
| 1991-06-14 12:00 | 13.0°S 67.4°E | TD | 30 mph / 45 km/h | 1000 mb |
| 1991-06-14 18:00 | 13.8°S 67.3°E | TD | 30 mph / 45 km/h | 1000 mb |
| 1991-06-15 00:00 | 14.6°S 67.5°E | TD | 30 mph / 45 km/h | 1000 mb |
| 1991-06-15 06:00 | 15.9°S 67.2°E | TD | 30 mph / 45 km/h | 1002 mb |
| 1991-06-15 12:00 | 18.5°S 67.3°E | TD | 30 mph / 45 km/h | 1002 mb |
| 1991-06-15 18:00 | 21.1°S 68.1°E | TD | 30 mph / 45 km/h | 1002 mb |
| 1991-06-16 00:00 | 23.5°S 69.4°E | TD | 30 mph / 45 km/h | 1004 mb |
| 1991-06-16 06:00 | 26.1°S 71.5°E | — | — | — |
| 1991-06-16 12:00 | 30.0°S 76.5°E | — | — | — |
Tropical Storm Gritelle 1991 FAQ
Did Tropical Storm Gritelle 1991 make landfall?
No. The best track does not record a landfall for Gritelle; it stayed over water.
How strong did Gritelle get in 1991?
Gritelle peaked as a tropical storm with maximum sustained winds of 45 mph (75 km/h) and a minimum central pressure of 984 mb.
When did Gritelle form and dissipate?
Gritelle was first tracked on Jun 5 1991 and last tracked on Jun 16 1991, about 12 days in all.