Skip to content
HurriTracker
Loading map…
Best track · IBTrACS
ArchivedPeak category 3

Cyclone Krisy (1989)

Track & history

Peak wind
120 mph / 195 km/h
Min pressure
941 mb
Dates
–
Landfall
None
All storms named Krisy

Storm history

Krisy formed in the Southern Hemisphere in March 1989 and peaked as a Category 3 cyclone with maximum sustained winds of 120 mph (195 km/h) and a minimum pressure of 941 mb. It did not make landfall. The system was tracked for 14 days.

Track data

Download CSV
Time UTCPositionStrengthWindPressure
1989-03-28 06:0011.0°S 73.0°ETD30 mph / 45 km/h1000 mb
1989-03-28 12:0011.1°S 73.1°ETD30 mph / 45 km/h1000 mb
1989-03-28 18:0011.3°S 73.3°ETD30 mph / 45 km/h1000 mb
1989-03-29 00:0011.6°S 73.7°ETD35 mph / 55 km/h997 mb
1989-03-29 06:0011.8°S 73.9°ETD35 mph / 55 km/h997 mb
1989-03-29 12:0012.1°S 73.7°ETD35 mph / 55 km/h997 mb
1989-03-29 18:0011.8°S 73.3°ETS40 mph / 65 km/h997 mb
1989-03-30 00:0011.9°S 73.1°ETS60 mph / 95 km/h997 mb
Show all 57 points
1989-03-30 06:0012.2°S 72.9°ETS65 mph / 100 km/h991 mb
1989-03-30 12:0012.5°S 72.7°ETS65 mph / 100 km/h984 mb
1989-03-30 18:0012.6°S 72.5°ETS70 mph / 110 km/h984 mb
1989-03-31 00:0012.7°S 71.9°EC175 mph / 120 km/h976 mb
1989-03-31 06:0012.6°S 71.6°EC175 mph / 120 km/h976 mb
1989-03-31 12:0012.5°S 71.2°EC185 mph / 140 km/h976 mb
1989-03-31 18:0012.7°S 70.7°EC190 mph / 150 km/h976 mb
1989-04-01 00:0012.9°S 70.3°EC2100 mph / 155 km/h976 mb
1989-04-01 06:0013.4°S 70.0°EC2105 mph / 165 km/h976 mb
1989-04-01 12:0013.8°S 69.9°EC3115 mph / 185 km/h976 mb
1989-04-01 18:0014.3°S 69.8°EC3115 mph / 185 km/h966 mb
1989-04-02 00:0014.8°S 69.9°EC3120 mph / 195 km/h954 mb
1989-04-02 06:0015.0°S 70.0°EC2110 mph / 175 km/h954 mb
1989-04-02 12:0015.3°S 70.2°EC2105 mph / 165 km/h954 mb
1989-04-02 18:0015.6°S 70.3°EC2105 mph / 165 km/h954 mb
1989-04-03 00:0016.0°S 70.5°EC2105 mph / 165 km/h941 mb
1989-04-03 06:0016.5°S 70.3°EC2105 mph / 165 km/h941 mb
1989-04-03 12:0017.1°S 70.1°EC2105 mph / 165 km/h954 mb
1989-04-03 18:0017.1°S 69.4°EC190 mph / 150 km/h966 mb
1989-04-04 00:0017.2°S 68.5°EC180 mph / 130 km/h966 mb
1989-04-04 06:0017.2°S 67.6°EC180 mph / 130 km/h966 mb
1989-04-04 12:0017.4°S 66.6°EC180 mph / 130 km/h976 mb
1989-04-04 18:0017.8°S 65.8°EC180 mph / 130 km/h976 mb
1989-04-05 00:0018.3°S 64.8°EC175 mph / 120 km/h966 mb
1989-04-05 06:0018.6°S 63.7°EC175 mph / 120 km/h976 mb
1989-04-05 12:0019.0°S 62.5°EC175 mph / 120 km/h976 mb
1989-04-05 18:0019.4°S 61.3°ETS70 mph / 110 km/h976 mb
1989-04-06 00:0019.8°S 60.0°ETS65 mph / 100 km/h976 mb
1989-04-06 06:0020.1°S 58.7°ETS60 mph / 95 km/h976 mb
1989-04-06 12:0020.8°S 57.5°ETS50 mph / 85 km/h984 mb
1989-04-06 18:0021.8°S 56.5°ETS50 mph / 85 km/h984 mb
1989-04-07 00:0022.8°S 55.5°ETS50 mph / 85 km/h984 mb
1989-04-07 06:0023.5°S 54.7°ETS50 mph / 85 km/h991 mb
1989-04-07 12:0024.1°S 53.8°ETS50 mph / 85 km/h997 mb
1989-04-07 18:0024.6°S 53.4°ETS40 mph / 65 km/h997 mb
1989-04-08 00:0025.4°S 53.3°ETD35 mph / 55 km/h997 mb
1989-04-08 06:0026.2°S 53.6°ETD35 mph / 55 km/h997 mb
1989-04-08 12:0027.1°S 54.1°ETD35 mph / 55 km/h997 mb
1989-04-08 18:0028.1°S 54.8°ETD35 mph / 55 km/h997 mb
1989-04-09 00:0028.6°S 55.9°ETD35 mph / 55 km/h1000 mb
1989-04-09 06:0028.3°S 57.4°ETD30 mph / 45 km/h1000 mb
1989-04-09 12:0028.1°S 59.0°ETD30 mph / 45 km/h1000 mb
1989-04-09 18:0027.9°S 59.9°ETD30 mph / 45 km/h1000 mb
1989-04-10 00:0027.9°S 60.8°ETD30 mph / 45 km/h1000 mb
1989-04-10 06:0027.4°S 61.6°ETD30 mph / 45 km/h1000 mb
1989-04-10 12:0026.8°S 62.1°ETD30 mph / 45 km/h1000 mb
1989-04-10 18:0025.0°S 62.0°ETD30 mph / 45 km/h1000 mb
1989-04-11 00:0024.0°S 62.0°ETS45 mph / 75 km/h—
1989-04-11 06:0023.0°S 62.1°ETS45 mph / 75 km/h—

Cyclone Krisy 1989 FAQ

Did Cyclone Krisy 1989 make landfall?

No. The best track does not record a landfall for Krisy; it stayed over water.

How strong did Krisy get in 1989?

Krisy peaked as a Category 3 cyclone with maximum sustained winds of 120 mph (195 km/h) and a minimum central pressure of 941 mb.

When did Krisy form and dissipate?

Krisy was first tracked on Mar 28 1989 and last tracked on Apr 11 1989, about 14 days in all.