Loading map…
Best track · IBTrACS
ArchivedPeak category 1
Cyclone Iggy (2012)
Track & history
Peak wind
80 mph / 130 km/h
Min pressure
970 mb
Dates
–
Landfall
Geraldton
Storm history
Iggy formed in the Southern Hemisphere in January 2012 and peaked as a Category 1 cyclone with maximum sustained winds of 80 mph (130 km/h) and a minimum pressure of 970 mb. It made landfall near Geraldton, Australia. The system was tracked for 11 days.
Track data
Download CSV| Time UTC | Position | Strength | Wind | Pressure |
|---|---|---|---|---|
| 2012-01-23 12:00 | 15.0°S 116.0°E | TD | 35 mph / 55 km/h | 1002 mb |
| 2012-01-23 18:00 | 15.1°S 114.5°E | TD | 35 mph / 55 km/h | 1001 mb |
| 2012-01-24 00:00 | 15.5°S 113.0°E | TD | 25 mph / 35 km/h | 1003 mb |
| 2012-01-24 06:00 | 16.0°S 112.0°E | TD | 30 mph / 45 km/h | 1004 mb |
| 2012-01-24 12:00 | 16.0°S 110.9°E | TD | 30 mph / 45 km/h | 1004 mb |
| 2012-01-24 18:00 | 16.0°S 110.0°E | TD | 35 mph / 55 km/h | 996 mb |
| 2012-01-25 00:00 | 15.9°S 109.2°E | TD | 35 mph / 55 km/h | 1000 mb |
| 2012-01-25 06:00 | 15.9°S 108.3°E | TS | 40 mph / 65 km/h | 996 mb |
Show all 43 points
| 2012-01-25 12:00 | 15.8°S 108.3°E | TS | 40 mph / 65 km/h | 996 mb |
| 2012-01-25 18:00 | 15.9°S 108.4°E | TS | 40 mph / 65 km/h | 996 mb |
| 2012-01-26 00:00 | 16.1°S 108.6°E | TS | 50 mph / 85 km/h | 989 mb |
| 2012-01-26 06:00 | 16.6°S 108.9°E | TS | 50 mph / 85 km/h | 989 mb |
| 2012-01-26 12:00 | 17.0°S 109.3°E | TS | 50 mph / 85 km/h | 989 mb |
| 2012-01-26 18:00 | 17.5°S 109.6°E | TS | 60 mph / 95 km/h | 985 mb |
| 2012-01-27 00:00 | 18.0°S 110.0°E | TS | 65 mph / 100 km/h | 982 mb |
| 2012-01-27 06:00 | 18.6°S 110.4°E | TS | 65 mph / 100 km/h | 982 mb |
| 2012-01-27 12:00 | 19.1°S 110.8°E | TS | 65 mph / 100 km/h | 982 mb |
| 2012-01-27 18:00 | 19.5°S 110.8°E | TS | 65 mph / 100 km/h | 982 mb |
| 2012-01-28 00:00 | 19.7°S 110.7°E | TS | 65 mph / 100 km/h | 982 mb |
| 2012-01-28 06:00 | 19.9°S 110.7°E | TS | 65 mph / 100 km/h | 982 mb |
| 2012-01-28 12:00 | 20.1°S 110.8°E | TS | 65 mph / 100 km/h | 982 mb |
| 2012-01-28 18:00 | 20.2°S 111.0°E | TS | 65 mph / 100 km/h | 982 mb |
| 2012-01-29 00:00 | 20.1°S 111.2°E | TS | 65 mph / 100 km/h | 982 mb |
| 2012-01-29 06:00 | 19.9°S 111.2°E | TS | 65 mph / 100 km/h | 982 mb |
| 2012-01-29 12:00 | 19.8°S 111.1°E | TS | 65 mph / 100 km/h | 982 mb |
| 2012-01-29 18:00 | 19.8°S 110.9°E | TS | 65 mph / 100 km/h | 982 mb |
| 2012-01-30 00:00 | 19.9°S 110.6°E | TS | 65 mph / 100 km/h | 982 mb |
| 2012-01-30 06:00 | 20.2°S 110.5°E | TS | 65 mph / 100 km/h | 982 mb |
| 2012-01-30 12:00 | 20.6°S 110.3°E | TS | 65 mph / 100 km/h | 982 mb |
| 2012-01-30 18:00 | 21.2°S 109.8°E | TS | 65 mph / 100 km/h | 982 mb |
| 2012-01-31 00:00 | 21.9°S 109.4°E | TS | 65 mph / 100 km/h | 982 mb |
| 2012-01-31 06:00 | 22.7°S 108.9°E | TS | 65 mph / 100 km/h | 982 mb |
| 2012-01-31 12:00 | 23.9°S 108.2°E | C1 | 75 mph / 120 km/h | 974 mb |
| 2012-01-31 18:00 | 24.9°S 107.8°E | C1 | 80 mph / 130 km/h | 970 mb |
| 2012-02-01 00:00 | 26.1°S 107.8°E | C1 | 75 mph / 120 km/h | 974 mb |
| 2012-02-01 06:00 | 27.4°S 107.8°E | TS | 70 mph / 110 km/h | 978 mb |
| 2012-02-01 12:00 | 28.5°S 108.7°E | TS | 70 mph / 110 km/h | 978 mb |
| 2012-02-01 18:00 | 29.2°S 109.5°E | TS | 60 mph / 95 km/h | 985 mb |
| 2012-02-02 00:00 | 29.8°S 110.8°E | TS | 60 mph / 95 km/h | 985 mb |
| 2012-02-02 06:00 | 29.9°S 112.0°E | TS | 45 mph / 75 km/h | 993 mb |
| 2012-02-02 12:00 | 29.9°S 113.2°E | TD | 35 mph / 55 km/h | 1000 mb |
| 2012-02-02 18:00 | 29.8°S 114.3°E | TD | 30 mph / 45 km/h | 1004 mb |
| 2012-02-03 00:00 | 29.7°S 115.2°E | TD | 30 mph / 45 km/h | 1004 mb |
Cyclone Iggy 2012 FAQ
Did Cyclone Iggy 2012 make landfall?
Yes. Iggy made landfall near Geraldton, Australia on Feb 3 2012, with sustained winds of 30 mph (45 km/h) at the first landfall.
How strong did Iggy get in 2012?
Iggy peaked as a Category 1 cyclone with maximum sustained winds of 80 mph (130 km/h) and a minimum central pressure of 970 mb.
When did Iggy form and dissipate?
Iggy was first tracked on Jan 23 2012 and last tracked on Feb 3 2012, about 11 days in all.